Housing, childcare and a short commute to work: in the Styrian town of Stainach, we are planning a staff accommodation block with an on-site nursery. In doing so, we are drawing on the urban planning concept of the adjacent hospital project, embedding half of the building into the gently sloping hillside and integrating it into the rural surroundings with a timber façade.
Details
Client
KAGes
State
Idea
Net Usable Floor Area
3.260 m²
Mixed-Use
Functionally, the building is divided into three sections: the two upper floors house the staff flats, which range from 18 to 75 m² to cater for different family sizes and needs. The balconies running all the way round the building provide everyone with their own private outdoor space. Access is via the pergola on the courtyard side and the stairwell on the south-east side. The three-group nursery on the ground floor has a separate entrance.
Bright Basement
From the forecourt, a landscaped external staircase leads to the offices for the mobile services – the hospital’s palliative care and remobilisation units. These areas are also supplied with natural light via the central courtyard. The upper floors are designed using timber construction. The external walls are timber-frame structures, whilst the load-bearing internal walls and ceilings are made of solid glued-laminated timber.
Type Of Commission
Direktauftrag nach Studie/Wettbewerbsgewinn Spital
Client
KAGes
Construction
2024
Gross Floor Area
4.040 m²
Scope Of Commission
Teil-Generalplanung
Location
Stainach-Pürgg
State
Idea
Net Usable Floor Area
3.260 m²
Team
Lukas Rütten (PL), Fanny Bruckbauer
Structural Engineer
KPPK
Building Physics
RWT Plus
Building Services
Elektro-Plan Friebe & Korp , Ingenieurbüro Starchel, : TB Franz Blaschitz
Landscape Planning
EGKK
Fire Safety Planning
Norbert Rabl
Other Cooperation
Entwässerungsplanung: GDP, Schmutzwasserplanung: Laubreiter


![[Translate to English:]](https://www.franzundsue.at/fileadmin/_processed_/9/5/csm_franz_sue_kindergarten_Immendorf_832_8f4029b83f.jpg)